Williamstown Sports Complex
Location | Waterford |
Value | €1.1m |
Timeframe | 5 months |
Architect | C.J. Falconer & Associates. |
Surveyors | Nolan Construction Consultants. |
This project consisted of the Completion of 1,270 sq.m. Shared Dressing Room Facility for various Sporting Clubs in Waterford, which had been built up to Eaves Level.
The Building consisted of 14nr Changing Rooms and associated Shower Areas and Toilets, 2nr Referees Changing Rooms, Storage Room, Meeting Room, Kitchen, Public Gents, Ladies, Disabled Toilet and a 130 sq.m Water Storage Area at 1st Floor Level.
Pebble dashed external walls with a combination of glass block and double glazed aluminium windows; steel and hardwood doors to Dressing rooms and toilets respectively; insulated kingspan roof on Z purlins on steel rafters with a feature bullnose fascia; internal fair faced painted blockwork throughout; a mixture of Trazcon Resin floor Finish to Dressing Rooms and Vinyl Sheeting to Meeting Room and Kitchen Area.
Mechanical & Electrical Installation were carried out on a Domestic Basis on this Project
Siteworks consisted of 1,200 sq.m. of a concrete Yard Area; Perimeter Palisade Fencing; associated Foul and Surface Water Drainage